REFERENCE LIST:
Year: |
Project Name / description: |
Customer: |
Scope of work: |
2006 |
Kompletní obnova ETU II, vodní hospodářství Detail design – Reconstruction of Tusimice II coal power plant, waste water systém |
Škoda Praha, a.s. |
Designer |
2007 |
Kontinuální čištění kondenzátoru TG4&TG5 Turn-key – continuous cleaning of the steam turbine condenser TG4&TG5, Kladno coal power plant |
Energetika Kladno, s.r.o. |
Chief project engineer, designer |
2007 |
Teplárna Karviná – Turbogenerátor TG6 (náhrada TG4) Basic design, building permit – replacement of old steam turbine TG4 new steam turbine TG6 |
Dalkia ČR, a.s. |
Chief project engineer, designer |
2007 |
220MW Cogeneration power plant Skopje, Makedonie Basic design – operational set „steam turbine hall“
|
Gama power systems, Turkey |
Designer |
2007 |
Projekt náhrady kotle K14 včetně nového turbogenerátoru TG13 Documentation for tender – recunstruction of boiler K14 and new steam turbine TG13, Energetika |
Energetika Třinec, a.s. |
Designer |
2008 |
Energoblok Nové Vráto Project for building permit – reconstruction of coal-fired heating plant and new biomass power plant 9,7MW |
Teplárna České Budějovice, a.s. |
Project manager, chief project engineer, designer |
2009 |
FVE Netolice Technical supervision – photovoltaic power plant 2,50MW, field instalation |
Solar 3, s.r.o. |
Technical supervision |
2009 |
Plnění emisních limitů teplárny Malešice Study – compliance with the emission limits coal heating plant Malešice, Prague |
Pražská Teplárenská a.s. |
Project manager designer, |
2009 |
FVE Určice Technical supervision – photovoltaic power plant 2,13MW, field instalation |
Solar 3, s.r.o. |
Technical supervision |
2010 |
Horkovod výtopna Nové Vráto – levý břeh Vltavy project for building permit, documentation for tender – 3km hot-water pipes from coal-fired heating plant into existing heating systém in České Budejovice city. |
Teplárna České Budějovice, a.s. |
Project manager, chief project engineer, designer |
2010 |
58 MWe zdroj pre PPC Energy, a.s. Bratislava Technical supervision – 58MW Rolls-Royce gas turbine operating as a peaging source of power |
PPC Energy, a.s. |
Technical supervision |
2010 / 2011 |
Enviromentální úpravy tepelného zdroje v Českém Krumlově – Domoradicích Feasibility study, basic design – reconstruction of coal-fired heating plant and construction of new biomass-fired boiler 40MW with 8,5MWe extraction condensing steam turbine |
INEKON POWER, a.s. |
Project manager, chief project engineer, designer |
2011 |
Přechod Pražského předměstí z páry na horkou vodu a zvednutí technologické lávky Energy audit – 1,7km of hot-water pipe system in centralized heat supply system and reconstruction of technological bridge |
Teplárna České Budějovice, a.s. |
Project manager, energy auditor |
2011 |
Enviromentální úpravy tepelného zdroje v Českém Krumlově – Domoradicích Detail design – basement of K4 steam boiler and separation wall in the dump coal |
První Brněnská Strojírna, a.s. |
Project manager, designer |
2011 |
Enviromentální úpravy tepelného zdroje v Českém Krumlově – Domoradicích Chief designer – reconstruction of coal-fired heating plant and construction of new biomass-fired boiler 40MW with 8,5MWe extraction condensing steam turbine |
INEKON POWER, a.s. |
Project manager, chief project engineer, designer |
2012 |
Ekologizace a obnova teplárny v Plané nad Lužnicí Feasibility study, building permit, documentation for tender – coal-fired power plant with 2pcs of steam boilers 35MW and 20MWe steam turbin and 4pcs of new Rolls-Royce gas-fired motor with 9,7MWe output power and HRSG boilers. |
C-Energy Bohemia, s.r.o. |
Project manager, chief project engineer, designer |
2012 |
Ekologizace a obnova teplárny v Plané nad Lužnicí Energy audit – coal-fired power plant with 2pcs of steam boilers 35MW and 20MWe steam turbin and 4pcs of new Rolls-Royce gas-fired motor with 9,7MWe output power and HRSG boilers. |
C-Energy Bohemia, s.r.o. |
Project manager, energy auditor |
2012 / 2013 |
Přechod Pražského předměstí z páry na horkou vodu a zvednutí technologické lávky Technical supervision – 1,7km of hot-water pipe system in centralized heat supply system and reconstruction of technological bridge |
Teplárna České Budějovice, a.s. |
Technical supervision |
2013 |
Rekonstrukce primárních rozvodů teplárny Planá nad Lužnicí Energy audit - reconstruction of the distribution of thermal energy etplárny Planá. partial transition from steam to hot water operation. |
C-Energy Bohemia, s.r.o. |
Project manager, energy auditor |
2014 | Horkovod pražské předměstí - II. Etapa Technical supervision – 1,5km of hot-water pipe system in centralized heat supply system |
Teplárna České Budějovice, a.s. | Technical supervision |
2015 |
Energetická hospodářství Metrans a.s. Energy audit – energy audit of six terminals for container transshipment. |
METRANS a.s. | Energy auditor |
2015 |
Vyvedení nízkopotenciálního tepla z teplárny C-Energy Technical and economic possibilities of low-potential heat from a heating plant for heating greenhouses growing tomatoes |
C-Energy Bohemia, s.r.o. | Feasibility study |
2016 |
Obchoní dům Prior - Vyškov Energy audit – energy audit of shopping centre |
LE CYGNE SPORTIF GROUPE a.s. | Energy auditor |
2016 |
Obchoní dům Prior - Karviná Energy audit – energy audit of shopping centre |
LE CYGNE SPORTIF GROUPE a.s. | Energy auditor |
2016 | Rekonstrukce tepelných sítí C-Energy Bohemia v areálu Kovosvit MAS Energy audit – modernization of pipe system in centralized heat supply system (replacement of steam for hot water) |
C-Energy Bohemia, s.r.o. | Energy auditor |
2016 | 8 x Energeticý posudek pro NZU dotace C.3.3. - fotovoltaický ohřev vody energy rating and processing subsidies NZU - DC watter heating |
8 x fyzická osoba | Energy auditor + designer |
2016 | 15 x Energeticý posudek pro NZU dotace C.3.4. - fotovoltaika s akumulací do vody energy rating and processing subsidies NZU - PV system with accumulation in water |
15 fyzická osoba | Energy auditor + designer |
2016 | 7 x Energeticý posudek pro NZU dotace C.3.5. a C.3.6. - fotovoltaika s akumulací do baterií energy rating and processing subsidies NZU - PV system with accumulation in batteries |
7 fyzická osoba | Energy auditor + designer |
2016 | Rekonstrukce primárních rozvodů teplárny Planá nad Lužnicí Final report from energy auditor - evaluate compliance with the environmental grant |
C-Energy Bohemia, s.r.o. | Energy auditor |
2016 | Ekologizace a obnova teplárny v Plané nad Lužnicí Final report from energy auditor - evaluate compliance with the environmental grant |
C-Energy Bohemia, s.r.o. | Energy auditor |
Obchoní dům Prior - Vyškov Energy audit – energy audit of shopping centre |